Lower Swifty is getting some work done. First feature is now the bike rack looking down rail, then either the small jump that was already there, up rail, or down box, next they put in a pole that has a plastic barrel on top of it for bonks off the last jump, and last will be what looks like a really wide quarter pipe. the line of flat boxes is still there as well. They also put in a small jump in upper swifty and a reall long down rail next to the last jump. Maybe like 30 feet long, and its like a 6 inch wide round bar.