There are a handful of rails waiting for us up on Stinger at the wide area. We will be up there early tomorrow morning putting them in. Unfortunately, I can't even say what will be up because it depends on several different things (snow and time being the biggest). We have a basic plan, but not really a structured layout. Really all I can tell you is that there's 2 corrugated pipes, the skinny rail, the cannon, the flat-up, and I believe the double barrel (can't remember the last rail) up there waiting for us early tomorrow morning, not saying all of those will be up, but some combination of them will be. Remember, everything needs to be put in and taken out every night we make snow (which will probably be every night for a while), and since we don't have access to a cat right now, everything needs to be small enough to move by hand.