timberline had a comp. on it today so i dont know whats on it but heres an update of Nor Easter (proceeding order):
flat-down box, C-box, down-flat-down rail, three teeny tiny jumps, a flat-down rail & a down box, a raised/suspended rainbow rail (its like the middle of a rainbow not a full one). thats the first half.
Second half; 80 ft flat to flat down rail, then two pretty decent jumps, a rainbow box and an urban flat-down handrail, a flat box, then the stair case which had (labeling from left to right) a down-flat box, a down box, down handrail, and another down box, finally there was the bus.