The park won't be up for probably two weeks, We had a long warm spell that set us back a bit.
We're making snow in our public,and main park, and we have a bunch of basic rails set up, also a flat-down-flat.
I've been hard a work building new rails here are some that will be up shortly.
4-20' round coping boxes (one six feet tall)
Five Kink Flat-Down....
flt-down-flat
down-flat-down
up-flat-down
up-down
up-flat
flat-down (2)
gehtto coaster
C-box
S-box
gehtto Wallride
2- 24' straight rails
4- 12' straight rails
2- 16' straight rails
2- 20' double barrels
not to mention 60+ foot jumps all season long, with smaller options.
Riding the expert park requires a park pass(5$/day).
The public park will have a nice 3-pack with 15and 30 foot jumps on each, with rails and boxes mixed through two slower runs.
People should be satisfied with the Public Park, and blown away by the MM Park.
Shelby