im gunna have to say killington, the park crew did a reaaally good job this weekend with keeping everything in shape and salted. The set ups not too bad either, mainly the new jump next to the halfpipe, which has a rope tow. So you can just do real quick laps of that jump which is really helpful. The main park however isnt all that good, its decent i guess. Starts off with either flat box or weird barrel jib thing, then either a shotgun flat bar with a decent drop off the end, or a down bar. Then either a flat-down rail or a mellow dfd box. Then either a barrel bonk or a weird pipe in the ground thing. Then a decent 35sh foot jump into a hip into either a up-flat-long down or a up-drop-flat box. Then its a step with with 3 take offs, the middle one having an up rail. Then a smallish jump, then a 30sh foot jump, then a 40sh foot jump. Then its the halfpipe or the new jump, which is 45sh feet but really fun. As i said before the park crew was going through the park all day checking up on things and keeping all the lips raked and salted, so it was pretty sick.