Update: Park City, New Features

jmpc

New member
The two jumps on upper Payday will open tomorrow. We are also adding 2 more jumps to the triple line on middle Payday (5 in a row) which will be open tomorrow. This gives us 7 total jumps on Payday tomorrow and will bring total features on the mountain to 22. We should reach 30 features by Friday. More jibs and jumps on the way!

Payday Jump Sizes:

Upper:

Jump 1: 12' long

Jump 2: 12'

Mid Payday:

Jump 3: 15' Jump 4: 15' Jump 5: 20' Jump 6: 22' Jump 7: 25'
 
sounds super duper! up on the 14th so not to much longer to go, but it just gets better and better! keep it up guys!
 
holy balls YAY i love pc this year best it has been in a while, i was happy yesterday with only the rail park but this is even better!!!
 
HELLZ YEAH. I THOUGHT I WAS IN HEAVEN TODAY. I CAN'T EVEN IMAGINE WAT TOMOROW WILL BE LIKE!!!
 
Sick im so stoked to go out there i leave on Christmas night only 1,382,400 seconds left!!!
 
wat happened to the 5th jump and the 20 foot jumps. they were SUPER fun but its not much more than the last park. i was kind of upset when i saw a claimed 20 footer only be 15.
 
hell yeah PC....

but

you should take all the snow from those micro jumps and make a decent 30 footer like keystone did!
 
ss004-1.jpg
 
yeah, instead of 6 little jumps, there sould be 3 medium jumps. like on the top 1 25 and then lower do like 2 30's or something.
 
Back
Top