Went monday, everything was set on mile and ready to shred.  They have a jump line with 5 or 6 tables, pretty small for the most part and they still need some tweaking, should be great by next weekend.  Last one is a 25-30 step-over with a nice floaty takeoff.
Two rail lines, one is a flat box, double bar down rail, down ledge, up box. The other line is a flat-down rail, down-flat rail, up-flat-down rail, to the same up box.
There is also a pipe, but I never hit it so I'm not sure how food it is.  Got cut up pretty good with all the soft snow, but people were hitting it all day so it can't be too bad.