Sugarbush park?

The park is not ready yet....the crew will be working to get the features in ASAP.

They have built more boxes and rails, including a 34' roller coaster that is pretty sick. We will also be using space on Cruiser Trail at Mt. Ellen to allow for more features and hits further up the mountain.

The guys are stoked to get moving and they have a bunch of features to put up.
 
sick, i saw that roller coaster, that thing looks awesome. any idea as to when you guys are gonna have it set up? after new years?
 
the new jumps at north were sick today!!! Sugarbush has finally produce 5 sick tables. They all have fun poppy lips with long landings.
 
The jumps vary in size from like 7 feet to maybe 30 ish. Every one of them is hittable. I think they're working on putting rails into the flatter part of the tralil, which is Which Way not Cruiser. Over all its sick.
 
The new park on Which Way at Mt Ellen is pretty sick. Sugarbush has finally made a solid park, for it being the end of december. Which way has 5 nice poppy hits, 2 hips, 1/4 bonk and four rails. They added two new rails today. They next to the down box A flat rail and the Red Bull box. They are next to the down box and trapaziod box, that they added friday night.

I hope they make a lower park by sunny d next. With a few monster hits and rest of there rails/boxes/wallrides. I hope they start something up over there this new week.
 
WOOWWW I was just at sugarbush yesterday and was on the OTHER mountain than what the park was on. clearly I can't deal with ski areas that have more than one mountain.
 
I am stoked on sugarbushs 1st jump park of the season. The hits aren't huge, but are nice poppy. The park is looking pretty sick for sugarbush standards and northern vt parks.

On there website says, they making lower mtn expert park. I assuming there making around sunny d area.

what the deal with the wallride? I notice it is missing few pieces. Are they gonna fix it soon for the lower park? It such a sick wallride. I wanna see that near the double coster box
 
I've heard that SuperParx forgot to put ply wood behind the skate-vert-wood so it was just ready to be broken through. And something about bolts and screws not being correct.
 
i talked to the groomer guy and he said that he is going to try his best to put soemthing together on riemgrasse just as long as there is enough snow. top half is gonna be jumps and stuff, bottom is gonna be half pipe. I heard something about them putting a bunch of money into their pipe this year.
 
Back
Top