ne body know what new shit there suposed to get for this year? i know about the superpipe, the banked box,s rail and donw to flat rail ne one know of the thing more?
the only thing that is made and 100% sure is the superpipe and the down flat down (12-12-24). There's more stuff being made but their only gonna confirm them when their made. But there are some sick plans, big and top quality!
i was hearing a lot of stuff along the lines of an s-box, i called bullshit at first, then everyone started talking about it.. but i still don't believe it man.. banked boxes too, but would be a probability.. don't they already have a flat down flat man?
yeah it will be sicker for sure man.. superpipe was something they needed Fuuucking bad.. and ill be skiing there way more often.. like half my time there and half at tremblant
The pipe will be above where the 2 big jumps were last year, they've made an elevated run up for it. The Park will be much better than last year guaranteed!
i think this is the most intelligent and informative thread ive ever read on ns. There hasnt been one person yet that said something stupid or ripped on someone else, and id like to get up to saveur this winter and this thread made me more anxious.
The Trapezoid and the Sex Change will be in a diffrent area this year. And after the pipe will be followed by 2 big jumps. The park layout will be diffrent then last years.