set up at louise

D-spin

Active member
does anyone know if the pro lines built yet, or the superpipe? or whats set up in their park sofar.

member number 3972 biatch
 
hahaha, they have like3 rails, all crap, and 2 mini jumps, like 10-15 feet long, they have sooooo much werk to do before they can get a proline up, like another couple weeks to a month

-------------------asp-------------------
 
Its weird. Sunshine has a better park right now then louise. from what I have heard, sunshine has a few decent jumps and a couple of rails too.

 
yeah when i got to louise today they had nothing at all done in their pro side but tons of blown snow, by the end fo the day they had what looks like a 100 foot long spine built and a pretty large table if they keep progressing like they did today the pro line should be fully made in a week.

member number 3972 biatch
 
sick, i hope they have those 4 pro line jumps up again, cause they were sick

-------------------asp-------------------
 
yea its looking like thats what they are going to do, with a big fucking hip after the last table

member number 3972 biatch
 
Back
Top