Opening day at bachelor

i would assume a few little features. im gonna be looking for some jibs come monday so hopefully they will have some shit set up
 
not all of sunshine is a rail park though that would be nice. 15 features are setup unless i cant count right now, either way, here it is. down bar, flat box, jump, down box, jump, trap box, hip, flat box, flat rail, up to down box, down corrugated tube, down flat down dub elbow, c box, s rail, and flat down flat box. we dont open till 12 cause of wind.

cheers,

hames
 
Back
Top