yeah it is pressure treated. it holds up against the weather better and it cost me about 60 bucks, about what i was looking at to make it. and i am putting things on the sides. its going to be fine
woah nice two year bump. I finished the rail and hit it and it was fine cause I put diagonals for support. I didn't need a drop in because it's on a hill. It was such a hassle to maintain though...shoveling all the snow we get so I took it apart and built flat rails with the lumber.