3 small 20-30 footers, but the super jump is being built(all they need is the lip).
they are building a channel gap, and one jump is operational(right side).  they are making snow to get the left side upen, hopefully.  They were also working on the pipe yesterday.  Down rail and rainbow are up.  down flat down is in the process of being set up.