Keystone this weekend

I'm guessing that the kickers are open at night since they are near the rails? And why are they building two sets of jumps?
 
yeah, the idea is once they get the second line open they will reduce the size on the ones under a lift a bit. cause the insurance company doesen't like it!
 
last week they had like 3 good kickers, a quarter pipe, and a ton of rails and shit...they also had two parks, one where it usually is, and one that starts from the top thats on the river run side
 
that second jump on the new jump line is going to kill people

seriously.

someone is going to get hurt on that table. it is far to big.
 
yes, the second jump looks like it will be a clean 60 footer. what are they doing with the third jump? it looks like their pushing it back, but if they left it in the position it was in yesterday it would seriouly be like a 100 footer.
 
i heard the first jump will be like 50-60ish, the secont like 70ish and the third will be like 80ish. what sucks is that the take off of the second jump starts like right after the landing of the first so you land then hit the seccond right away.
 
you're not talking about keystone right? first jump is maybe 25 second is around 50 third is maybe 60 at the most
 
are you sure? i saw them 2 weeks ago and they looked like they were gonna be huge, we asked a park crew guy and he said they wanted them to be about 60 70 and 80. it wouldnt make sense to make the jumps pretty much the same size as the other 3.
 
yeah nevermind i went there today and the last one is mabye 55 at the most, but its so much better than the other side, you have alot more time and its really floaty.
 
Back
Top