I know you're jealous

we used 32 feet of piping for it, so 32 feet, but i wanna know from

like what it is if u measure along the ground then thats like 29 feet

or something, i dont really get how that works out but thats what it is.
 
i built a rail just like that. It was rediculuosly hard to clean though because of the transition from the down to the second up was too steep. i had to cut it and re bend the pvc 3 times before i got the transition right

 
ya well im making some supports coming down from the main vertical supports onto their feet, and im thinking about putting plywood on the bottom of the feet.
 
look what i can do

..._...|..____________________, ,

....../ `---___________----_____|] = = = = = D

...../_==o;;;;;;;;_______.:/

.....), ---.(_(__) /

....// (..) ), ----"

...//___//

..//___//

.//___//
 
um like 4 hours to assemble it but i had to get the supports and plywood and pvc cut at my friends house but that only took like probly 30min cause we had to think of how big we were making it and at what angle to cut the supports.
 
well i know your jelous. i jsut spent the last 3 hrs having a rail jam while you were all sitting on ns/masturbating
 
well i know you're jealous i wasnt sitting on ns/masturbating i just got back from seeing jackass 2, and yes it was epic. so take that.
 
hmmmm...i hate to be the barrer of bad news but i think that 1. it is doing to fall apart....2...if you barry it in snow in winter...the wood will be rotten by time summer comes around...and 3...i think that the bend is to drastic and that the pvc is going to catch your edge when u hit it. i personally agree with the majority of the others who posted in saying that you are going to die when u hit it.
 
1. um, hopefully not, and im getting the supports cut tomorrow so i'll get a ton of em put in.

2. Im going to paint it

3. i hope it isnt, its looks more drastic in the picture than how it actually in person i think.
 
Back
Top