steezyjibber Active member Jun 21, 2007 #1 if i attempted to make one, how long should it be from one end to the other
J _Joe_ Member Jun 21, 2007 #2 how ever long you can get it with the speed you got, but for a c id say like 10-15 feet would be good
how ever long you can get it with the speed you got, but for a c id say like 10-15 feet would be good
PatVigorito Member Jun 22, 2007 #10 if you screw it down enough it would. or if you can get your hands on a heat gun...
TylerS Active member Jun 22, 2007 #11 dont they have pvc thats flexier than regular pvc? i saw a vid of some kid who made an s-rail with it. it was like a greenish yellow
dont they have pvc thats flexier than regular pvc? i saw a vid of some kid who made an s-rail with it. it was like a greenish yellow
jibmaster_josh Active member Jun 24, 2007 #15 this one is 10 feet, pvc. dont need a heat gun, it bends perfectly fine without one
MadSteezin Active member Jun 30, 2007 #17 make it ask if you were going to build a ramp but two of them
TheButterHashira Active member Jul 11, 2007 #18 i dont like how steep that thing looks. it looks like youd need alot of speed to stick to it
jibmaster_josh Active member Jul 11, 2007 #19 ^yeeahh...lol the supports busted off on the first hit (shoulda seen it oming, probably the worst construction ever!!) but the actual rail part is still intact and strong. so now, it is more level and more fun to hit.
^yeeahh...lol the supports busted off on the first hit (shoulda seen it oming, probably the worst construction ever!!) but the actual rail part is still intact and strong. so now, it is more level and more fun to hit.