UPDATE:today they had 3 new rails set up, which i couldve made myself, they were shit, they had a rainbow box with the biggest bombholes in landing it was impossible to slide 90 and pop out to normal or switch because the bombhole was snowboard width, they also bought these 2 stupid up flat rails about 5 ft in length, no lip on just like a stick in the ground stupidest shit ever...the had they down rail and the a frame set up pretty nicely minus the snowboard run in hole that was pressured into the landing  and a big tire tap..it wouldve been ok if park crew would have actually fixed the lips and landings up which they didnt so it wasnt good at all