as of newyears eve:
Right of chair had 2 15ish step down then 1 15ish/30ish step down. (/ = right/left)
Left of chair had a upper mail box 12' the sobe U-F-D thing then a quarter with a tire and a trashcan on it
after the catwalk it had a pipe, handrail, 2 boxes, 2 c boxes, 2inline picknick tables, a mail box, a flat rail a 12-15' jump then the triangle thing with a tube top section at the bottom. also one down hand rail.