yep, should be up and running by sat. started pushing the snow up for it this eaving, going to have two table lines, 20-30-35 and 40-50-60, then some rails, last time I talked with the builders they had about 3 flat bars going from 10 to 20 ft, a 20 ft rainbow 25 ft flat down and some boxes. like 2 flat ones and a flat down box. most of the stuff should be built by sunday, with only like the bigest jump unfinished. putting lots of people on it.