Working on plans

while I'm waiting to be accepted to the build-a-jib cult I'm posting this to see if I can get some input.

I'm making a down flat down rail. I need recommendation on angles.

what would be a good angle for the two down sections. I figured if I have an eight foot pipe on each section, and from the beginning of the down to the flat section it drops 3 feet I will have a 30 degree angle. would this be an ideal steepness? (considering I am using pvc)

+k I guess, since you guys the homies
 
Also, to direct responses with 4 ft drops each down section the rail would have to be +8ft. If it dropped 3 ft instead the down angles would be at 22 degrees and my setup would only have to be 6ft
 
Back
Top