Right now Waterville is setting up for The North Face open park and pipe open. If they don't change it, right now there are basically two lines to choose from up the top. The left side is a down rail to a propane tank jib into a 15-20 footer into a 30-35 footer. The right side there is a down box or down rail to choose from into a 35-40 footer then into a 55-60 footer. Then there's the rail selection down the bottom with a flat round rail, flat box, flat up, u-box, a down flat, and a skullcandy tube. Oh and the hubba stairset. I'm not sure but I think they may be adding some more features this week. I'm just not totally sure. I'll try to keep you updated. As for lift lines, every place is going to be crowded on weekends and especially President's Day weekend. The good thing about WV is you have the poma that will let you ride park anytime though.