New Evolution Tour Rail System For 08

What up Newschoolers,

I have been designing the rail system for next year and I wanted to update you all. I have a ton of ideas I am working on but here is what I have so far. We are going to have left, right, and center servings for each rail. I am designing an attachment system that will allow competitors to transfer any rail from any side. Also there will be about 10-15 feet of downhill slope at the end of the rails with the padding extended 10 feet in all directions. I am rounding all the tranees on the drop ins making it even smoother than it already is. I am also working on a stall jib that runs across the end of the landing area giving you guys another option. And last but not least we will be bringing new and much more creative rail options. I will post the blueprints when there done.

Keep progressing,

Brad
 
transfers would be cool but it would make the rails mad close, doing a gap more then 4ft is damn hard.
 
I like the idea of extending the landing and making a slope, my heels killed after landing on the flat after so long.
 
Back
Top