Dry slope help

Aidin954

Member
Hey guys I need your help. I plan on building a dry slope but i only have a total of about 20 feet to work with. That's from the drop in to the landing. If you guys have any tips or setups that you can recommend I would really appreciate it. I need all the help I can get. Thanks.
 
I'm sorry, but you won't be able to do too much with 20 feet. Good luck but your drop in just won't be long enough to give you speed and even then you'll only be able to fit maybe an 8ft rail at most. If you're set on trying, I'd make plans for a 10 foot drop in, 7 foot rail, and 3 feet of landing.
 
13431239:-WZ- said:
I'm sorry, but you won't be able to do too much with 20 feet. Good luck but your drop in just won't be long enough to give you speed and even then you'll only be able to fit maybe an 8ft rail at most. If you're set on trying, I'd make plans for a 10 foot drop in, 7 foot rail, and 3 feet of landing.

I'm pretty contempt on building one so i'll take that idea. you have any ideas for a good 10 foot drop in? To be honest i've never actually seen one that small.
 
Back
Top