Does brighton have their jumps set up yet?

similar question: how is gatorade free flow pipe going to happen there this weekend if they're not going to have a pipe?
 
Yeah, probably just get canceled. Slope is gonna be weak too. probably one rail at the top then the two jumps. The stunt ditch is mad tight though.
 
its literally a stunt ditch, not a half pipe. its 1-2ft deep with rails on the sides.
 
i was there yesterday they were grooming the half tunnel looks like it should be ready by the weekend
 
i doubt the pipe will be open. the gatorade course is a shooter or that rail with creeperbox on it to the 2 jump line if anyone was wondering.
 
Back
Top