I've got the lengths written down, I can't seem to remember exactly right now.
As you can see we were starting to re-build that second table to have 2 takeoffs and a rail, but we got into building this 130ft box setup and a whole bunch of snow.
It looks like we might get some more dirt work done this season, the last jump is pretty much dialed in for dirt work, but the first and second are pretty much made out of snow. So if you ripped hemlock in the past you should think about coming back! They've been keeping up on the road a lot more often aswell.
Well the pic is pretty small, you might wanna click on it to get an up close. but the second jump in the jump line at this time was probably 38-40ft. Although this was built after the 3rd, so I'm not sure if its what you want