I definately have the northeast in mind when I mean east coast. We are working in the Jibyard very day. I have designed a system that will consist of 10-15 rails hang above each rail field that will allow riders to switch out all kinds of rails in a matter of minutes. Our jump is going to be unlike anything before. I will have hang time of a 40ft table. I have designed a retractible landing. Riders can practice into a foam pit then lower a landing so they can land it. This will also allow us to host big air as well as rail jams. I dont think that I will ever finish this place because of all the ideas I have. Also, no matter what we build, we won't add a single cent to the entry fee. $20 all day in and out all you want. Yes we will be open on monday. Shit, its the 4th of july and we are sessioning right now. I think its what our founding fathers would have wanted ha ha.
We will open more Jibyards as soon as we can, but I won't sellout to do it. The Jibyard was designed financed and hand built by Jibbers, and that will never change.